Files
ai-resume/content/edge/l3/edge-front-door.md
Documenter 286aa12bb0 site: cut the template's own labels out of the pages
Point 7 of the page-wording review. The pages no longer show their data
structure as headings, and they no longer explain their own conventions.

- Level 1 is one screen: claim, status badge, three figures, the technology
  row, and one sentence carrying one link. Measured in headless Chrome at
  1440x900: 1404-1845 px tall before, exactly 900 px (no scroll) after, on
  all six area pages.
- DocPage: no kicker line, no visible level label, no "Evidence for this
  page" heading or instruction note, no "Drill-downs" list, no
  "Status <word> - sentence" footer. The artefact table starts at level 2,
  under the heading "Artefacts"; the history timeline is level 2 only.
- Landing page: "Start here" link text gone, "How to read this site" panel
  gone, the footer's status-label explainer gone.
- Content, presentation only, no claim softened: the leading H1 that
  duplicated the page title removed from all 41 documents; level 1 bodies
  reduced to the constraint as ordinary prose plus the way in;
  "**Status: ...**" prefixes removed from the artefact stubs; "## Drill-downs"
  and "## Period and confidence" removed from the level 2 pages, with the
  cross-area links moved into the prose.
- The six level 1 claims are now sentences with a subject, and use commas
  instead of middots. Same facts, no new ones.

Not in this commit: the 35 level 2 and 3 claims still use the compact CV
style. That is a voice decision for Sam, not a wording tidy-up.

make validate: 41 documents, 0 violations. go test ./...: pass.

(cherry picked from commit 03009f80fc7815ad7719412e125df9297a6e653f)
2026-10-28 15:55:33 +11:00

34 lines
1.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
id: edge-front-door
area: edge
level: 3
title: "Artefact — Front door · vision · voice · and a rebuild"
claim: "A doorbell that sees a person · describes the image · speaks to the house and to the visitor · and is currently being rebuilt with a time-of-flight sensor."
confidence: in-progress
period: "2020–"
tech: [ESP32, ESP32-CAM, PIR, mmWave, VL53L0X, MiniMax, Piper, Whisper, Apprise]
metrics: [{label: "voice engines in use", value: 2}, {label: "presence sensing inputs", value: "PIR · mmWave · time-of-flight"}]
artefacts: []
public: true
last_verified: 2026-10-26
tags: [edge, doorbell, vision, voice, artefact]
---
The device was built and is being rebuilt. The page states this rather than describing it as finished.
## What the artefact is
A door unit with microphone, speaker, camera, button, PIR and mmWave presence. It detects a person, captures an image, logs it, has the image described, and announces to the house who is at the door before offering a spoken greeting; the visitor's reply is captured and played over the house speakers, with an alert pushed to a phone. Voice output ran on one provider and now runs on a cloned voice with a fallback to a local synthesiser.
## What it proves
Vision, voice and actuation in one device under real constraints — latency that a person at a door will tolerate, and a failure mode that must be polite.
## Limits stated on the page
The measurement it is being rebuilt around: presence detection with a time-of-flight ranging sensor, to stop the unit greeting people who are walking past rather than standing at the door. Until the rebuild is finished the honest label is `in-progress`.
## When it is delivered
Phase 7 for photos and the sensor change. Source: evidence notes section 1.