Handover: history, plan, API measurements, checklist, open issues from the OMA attempt

This commit is contained in:
sam
2026-11-10 09:46:47 +11:00
commit 41a6ae6210
8 changed files with 878 additions and 0 deletions

32
README.md Normal file
View File

@@ -0,0 +1,32 @@
# Paperclip harness — start here
This is a new project. Nothing here runs yet. It exists so the third attempt starts from
a clean place, with the history of the first two attempts attached.
Read these in order:
1. `HANDOVER.md` — what we tried before, what worked, what failed, and why this is different.
2. `docs/PLAN.md` — the plan: the four screens, the milestones, what is Paperclip's job and what is ours.
3. `docs/PAPERCLIP-API-NOTES.md` — what we measured against your running Paperclip, with the endpoint and the response.
4. `CHECKLIST.md` — the exact steps for the next session, in order, with boxes to tick.
## The one-line version
Paperclip already owns tasks, blockers, comments, approvals, runs, cost and git
worktrees. We are building one small Go terminal program with four screens on top of it.
Nothing else.
## What you need installed (all present on .13 today)
- Paperclip server running locally on `http://127.0.0.1:3100` (it is; 685 endpoints).
- `PAPERCLIP_BOARD_KEY` in the environment — the **user** key. The terminal program uses
this one. An agent key cannot write outside a heartbeat run.
- Go toolchain, for the terminal program.
- Pi, which is already the worker adapter on your Paperclip agent.
## Rules for this project
- No interface work before a real task has run end to end.
- Paperclip owns the facts. We never keep a second copy of a task, a blocker or a cost.
- Every claim in a document names the command that showed it.
- Nothing is copied from the old project except documents.