Handover: history, plan, API measurements, checklist, open issues from the OMA attempt
This commit is contained in:
53
CHECKLIST.md
Normal file
53
CHECKLIST.md
Normal file
@@ -0,0 +1,53 @@
|
||||
# Checklist for the next session
|
||||
|
||||
Tick each line. Nothing after the first unchecked line should be started early.
|
||||
|
||||
## Before you start
|
||||
|
||||
- [ ] Paperclip answers: `curl -s -H "Authorization: Bearer $PAPERCLIP_BOARD_KEY" http://127.0.0.1:3100/api/health`
|
||||
- [ ] Go is installed: `go version`
|
||||
- [ ] You are using the **user** key (`PAPERCLIP_BOARD_KEY`), not the agent key.
|
||||
|
||||
## Milestone 1 — one task, really run (no interface)
|
||||
|
||||
- [ ] Read the sandbox from `docs/PAPERCLIP-API-NOTES.md`; it has two tasks, the second blocked by the first.
|
||||
- [ ] Give the first task to the Pi agent on the task (assign it) and let a heartbeat run it.
|
||||
- [ ] Watch: the task goes `todo` → `in_progress` → `done`.
|
||||
- [ ] Confirm a comment written by Pi holds what it did.
|
||||
- [ ] Confirm the cost appears: `GET /api/issues/{id}/cost-summary`.
|
||||
- [ ] Confirm Paperclip made a git worktree for the task, and where it put it.
|
||||
|
||||
Stop here if any line fails. Write down what you saw. Do not start the screens.
|
||||
|
||||
## Milestone 2 — task tree and reply box
|
||||
|
||||
- [ ] Create the Go module in `tui/`.
|
||||
- [ ] Screen 1 reads tasks for one project; blockers read **per task** (`/api/issues/{id}/diagnostics/blockers`), never from the list.
|
||||
- [ ] Screen 4 shows the thread and posts a reply with the user key.
|
||||
- [ ] Pass: move a blocked task forward from the terminal, no browser, no shell.
|
||||
|
||||
## Milestone 3 — add a task, watch it work
|
||||
|
||||
- [ ] Screen 2 creates a task with a blocker and the command that decides it is done.
|
||||
- [ ] Screen 3 shows the running log and the diff from the task's worktree.
|
||||
- [ ] Pass: a two-task plan is created, ordered and finished from the terminal alone.
|
||||
|
||||
## Milestone 4 — the project layer
|
||||
|
||||
- [ ] Adopt a folder as a project; remember which host it is on.
|
||||
- [ ] Build the page layout; repair it; reset it.
|
||||
- [ ] Pass: a project on another machine can be opened and used from here.
|
||||
|
||||
## Milestone 5 — review and merge
|
||||
|
||||
- [ ] `ocr` runs over the diff; a failing review refuses the task.
|
||||
- [ ] Merges are one at a time, re-checked after each.
|
||||
- [ ] Pass: the next task cannot merge until the first is settled.
|
||||
|
||||
## Interface rules that are not optional
|
||||
|
||||
- Handle the window-size message; never hardcode sizes; show "too small" instead of a broken layout.
|
||||
- Run in the alternate screen.
|
||||
- In TUIOS window mode, `h j k l`, `z`, `n` belong to TUIOS: use Tab, Shift-Tab, arrows, Space, Enter inside the app, and keep a bare Esc free to close a box.
|
||||
- Create the click-zone manager once and wrap the whole view.
|
||||
- No network or git work inside update or view — use commands that return messages.
|
||||
Reference in New Issue
Block a user