Phase 10 (the last phase of this project) is the project-docs pass. Update the
Gitea README, add the Mermaid source and rendered PNG, build the interactive
Archify map, add the Vikunja board tasks, and write the Outline AI-context
collection in Simplified Technical English.
Deliverables:
- README.md: status header, Phase 4 gap statement, "Architecture" section with
embedded Mermaid + image + Archify link, "Documentation set" table, an
explicit two-plane MQTT section (1883 plain+anonymous, 8883 TLS+ACLs), and
the Android client's Usage Access and VpnService paths.
- AGENTS.md section 11: tick Phase 10, leave Phase 4 unticked, status line now
"9 of 10 done - only Phase 4 outstanding".
- docs/architecture.mmd + docs/diagrams/architecture.png (mmdc).
- docs/archify/architecture.architecture.json + docs/architecture-map.html
(Archify, showcase, 9/9 checks, 0 errors).
- docs/outline/00-index.md .. 04-agent-runbook.md (STE).
- docs/vikunja-tasks.json (Vikunja project "Internet Use Control", id 20).
- Obsidian note written to 010 inbox on .27; the obsidian-sorter proposed a
folder and waits for the vault owner's approval.
Phase 4 (Python Windows computer client) is deliberately deferred and is NOT
built. Every document says so.
Co-Authored-By: Paperclip <noreply@paperclip.ing>