Phase 10: publish the documentation set + tick AGENTS.md 9 of 10
Phase 10 (the last phase of this project) is the project-docs pass. Update the Gitea README, add the Mermaid source and rendered PNG, build the interactive Archify map, add the Vikunja board tasks, and write the Outline AI-context collection in Simplified Technical English. Deliverables: - README.md: status header, Phase 4 gap statement, "Architecture" section with embedded Mermaid + image + Archify link, "Documentation set" table, an explicit two-plane MQTT section (1883 plain+anonymous, 8883 TLS+ACLs), and the Android client's Usage Access and VpnService paths. - AGENTS.md section 11: tick Phase 10, leave Phase 4 unticked, status line now "9 of 10 done - only Phase 4 outstanding". - docs/architecture.mmd + docs/diagrams/architecture.png (mmdc). - docs/archify/architecture.architecture.json + docs/architecture-map.html (Archify, showcase, 9/9 checks, 0 errors). - docs/outline/00-index.md .. 04-agent-runbook.md (STE). - docs/vikunja-tasks.json (Vikunja project "Internet Use Control", id 20). - Obsidian note written to 010 inbox on .27; the obsidian-sorter proposed a folder and waits for the vault owner's approval. Phase 4 (Python Windows computer client) is deliberately deferred and is NOT built. Every document says so. Co-Authored-By: Paperclip <noreply@paperclip.ing>
This commit is contained in:
@@ -189,8 +189,9 @@ The Hub interface is frozen in `central_ai_llm_master/docs/ask-contract.md`.
|
||||
|
||||
## 11. Build order
|
||||
|
||||
**STATUS — 8 of 10 done (checked 2026-10-14).** Keep this list current: tick a box
|
||||
when its DoD passes. **The project is DONE only when every box is ticked.**
|
||||
**STATUS — 9 of 10 done — only Phase 4 outstanding (checked 2026-10-14).** Keep
|
||||
this list current: tick a box when its DoD passes. **The project is DONE only when
|
||||
every box is ticked.**
|
||||
|
||||
- [x] Phase 1 — Skeleton
|
||||
- [x] Phase 2 — Devices and state
|
||||
@@ -201,7 +202,7 @@ when its DoD passes. **The project is DONE only when every box is ticked.**
|
||||
- [x] Phase 7 — Telemetry and usage
|
||||
- [x] Phase 8 — Overrides
|
||||
- [x] Phase 9 — Hub and alerts
|
||||
- [ ] **Phase 10 — Documentation** ← REMAINING
|
||||
- [x] Phase 10 — Documentation
|
||||
|
||||
**PROCESS RULE:** at project start, create one Paperclip issue per phase, status
|
||||
`backlog`, assigned to the agent. Close each as its DoD passes. Do **not** create
|
||||
|
||||
Reference in New Issue
Block a user