Phase 10: publish the documentation set + tick AGENTS.md 9 of 10

Phase 10 (the last phase of this project) is the project-docs pass. Update the
Gitea README, add the Mermaid source and rendered PNG, build the interactive
Archify map, add the Vikunja board tasks, and write the Outline AI-context
collection in Simplified Technical English.

Deliverables:
- README.md: status header, Phase 4 gap statement, "Architecture" section with
  embedded Mermaid + image + Archify link, "Documentation set" table, an
  explicit two-plane MQTT section (1883 plain+anonymous, 8883 TLS+ACLs), and
  the Android client's Usage Access and VpnService paths.
- AGENTS.md section 11: tick Phase 10, leave Phase 4 unticked, status line now
  "9 of 10 done - only Phase 4 outstanding".
- docs/architecture.mmd + docs/diagrams/architecture.png (mmdc).
- docs/archify/architecture.architecture.json + docs/architecture-map.html
  (Archify, showcase, 9/9 checks, 0 errors).
- docs/outline/00-index.md .. 04-agent-runbook.md (STE).
- docs/vikunja-tasks.json (Vikunja project "Internet Use Control", id 20).
- Obsidian note written to 010 inbox on .27; the obsidian-sorter proposed a
  folder and waits for the vault owner's approval.

Phase 4 (Python Windows computer client) is deliberately deferred and is NOT
built. Every document says so.

Co-Authored-By: Paperclip <noreply@paperclip.ing>
This commit is contained in:
2026-10-14 12:13:21 +11:00
parent 5a9e56bb1f
commit eb300b6701
12 changed files with 14593 additions and 11 deletions

View File

@@ -189,8 +189,9 @@ The Hub interface is frozen in `central_ai_llm_master/docs/ask-contract.md`.
## 11. Build order
**STATUS — 8 of 10 done (checked 2026-10-14).** Keep this list current: tick a box
when its DoD passes. **The project is DONE only when every box is ticked.**
**STATUS — 9 of 10 done — only Phase 4 outstanding (checked 2026-10-14).** Keep
this list current: tick a box when its DoD passes. **The project is DONE only when
every box is ticked.**
- [x] Phase 1 — Skeleton
- [x] Phase 2 — Devices and state
@@ -201,7 +202,7 @@ when its DoD passes. **The project is DONE only when every box is ticked.**
- [x] Phase 7 — Telemetry and usage
- [x] Phase 8 — Overrides
- [x] Phase 9 — Hub and alerts
- [ ] **Phase 10 — Documentation** ← REMAINING
- [x] Phase 10 — Documentation
**PROCESS RULE:** at project start, create one Paperclip issue per phase, status
`backlog`, assigned to the agent. Close each as its DoD passes. Do **not** create