Satisfies the Phase 1 Definition of Done: - content/ validates cleanly against the frozen schema. `make validate` reports OK: 40 document(s) validated, 0 violations. - Six areas exist, each with an L1 entry: ai-overview, platform-overview, edge-overview, products-overview, history-overview, about-overview. - All six areas have an L2 entry: ai-systems, platform-estate, edge-fleet, products-business, history-engagements, about-narrative. - 28 L3 artefact stubs under content/<area>/l3/. Every artefacts[].url in every document resolves to one of them; the validator proves there are no dangling references (and a deliberately broken copy exits 1). - Every metric value traces to a source line in the evidence notes or the approved metric set in reference/content-map.md (per-metric citations are recorded in the AUD-131 completion comment). - Every document carries confidence and last_verified=2026-10-26; the validator rejects a missing or non-canonical value. - docs/content-redaction.md records the redaction pass: identifiers, third party personal data, credentials and infrastructure detail excluded, with reasons, plus the two numbers that are reported rather than smoothed. Honesty positions held: 3 businesses active (12 adoptions over time), Where-Woof deployed and pre-market, failures kept in (edge-failures), no promotion of in-progress work to delivered. No site code, no templates, no CSS, no rendering (Phase 2).
1.3 KiB
1.3 KiB
id, area, level, title, claim, confidence, period, tech, metrics, artefacts, public, last_verified, tags
| id | area | level | title | claim | confidence | period | tech | metrics | artefacts | public | last_verified | tags | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ai-paperclip-pipelines | ai | 3 | Artefact — Paperclip and n8n pipelines in production | Sixteen or more pipelines run real work — scanners · schedulers · project agents — with specialist agents dispatched by task and human approval gates on anything consequential. | running | 2020– |
|
|
true | 2026-10-26 |
|
Artefact — Paperclip and n8n pipelines in production
Status: stub. A redacted run log of one pipeline lands in Phase 7, alongside the pipeline inventory.
What the artefact is
One pipeline shown end to end: trigger, steps, the agent or model each step uses, the approval gate, and the run log with identifiers removed. Alongside it, the inventory of what the sixteen or more pipelines do — email scanners, school-portal scanners, calendar scanners, project oversight, and the household automations.
What it proves
Volume with operations behind it: these are scheduled, logged and monitored, not run once for a demonstration.
When it is delivered
Phase 7. Counts come from the evidence notes, section 3.