Satisfies the Phase 1 Definition of Done: - content/ validates cleanly against the frozen schema. `make validate` reports OK: 40 document(s) validated, 0 violations. - Six areas exist, each with an L1 entry: ai-overview, platform-overview, edge-overview, products-overview, history-overview, about-overview. - All six areas have an L2 entry: ai-systems, platform-estate, edge-fleet, products-business, history-engagements, about-narrative. - 28 L3 artefact stubs under content/<area>/l3/. Every artefacts[].url in every document resolves to one of them; the validator proves there are no dangling references (and a deliberately broken copy exits 1). - Every metric value traces to a source line in the evidence notes or the approved metric set in reference/content-map.md (per-metric citations are recorded in the AUD-131 completion comment). - Every document carries confidence and last_verified=2026-10-26; the validator rejects a missing or non-canonical value. - docs/content-redaction.md records the redaction pass: identifiers, third party personal data, credentials and infrastructure detail excluded, with reasons, plus the two numbers that are reported rather than smoothed. Honesty positions held: 3 businesses active (12 adoptions over time), Where-Woof deployed and pre-market, failures kept in (edge-failures), no promotion of in-progress work to delivered. No site code, no templates, no CSS, no rendering (Phase 2).
5.0 KiB
id, area, level, title, claim, confidence, period, tech, metrics, artefacts, public, last_verified, tags
| id | area | level | title | claim | confidence | period | tech | metrics | artefacts | public | last_verified | tags | |||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| history-engagements | history | 2 | Fifteen years of delivery for agencies and their clients | Twenty-two agencies and twenty-three brands · national campaigns · bank and broadcaster platforms · betting front-ends · and a habit of being called in to rescue work someone else could not finish. | historic | 1999–2014 |
|
|
|
true | 2026-10-26 |
|
Fifteen years of delivery for agencies and their clients
Capability statement. Range under deadline. The work in this period ran from car classifieds and online betting to a bank's pitch piece, a broadcaster's on-demand banners and a publisher's education platform — usually with a date attached that could not move.
The eras, briefly
1999–2002 — the start. Web design and development for a high-volume car marketplace, then freelance work building sites, applications, interfaces and database back ends for small agencies.
2002–2005 — London, full time. Online gaming: lead front-end developer on a synchronous multi-game platform handling a thousand simultaneous clients, integrating against Java back ends and XML sockets. Then the emerging interactive advertising industry, where a creative front end with a technical spine was scarce.
2006–2009 — the agency run. The bulk of the client wall: bank pitch work delivered in weeks, broadcaster promotions, a global oil company's re-brand site, premium drinks campaigns, a news organisation's media presentation layer, a publisher's education platform, and a global computer-aided design vendor's localised site. Several of these were rescues — brought in on a short deadline to rewrite work another team could not land.
2009–2012 — product and campaign. A standalone encrypted presentation builder with its own media library and remote update path. A national beer campaign with video submissions, cross-brand promotion, in-store mechanics and authorisation over SOAP. Interactive launches with 3D content in the browser.
2012–2014 — small products for small business. Online book building, a reactive design system, and art applications for a motion-sensing controller, transitioned toward mobile.
2014–2020 — the workshop years. The site builder and the signage product (see Products), which is where the work moved from delivering campaigns for other people's brands to owning software and supporting customers.
Languages across the eras
The point of the exhibit set is that the tooling changed repeatedly and the delivery discipline did not: ActionScript 3 with class-based architecture, hand-written JavaScript engines, PHP media pipelines, TypeScript with typed service layers and a relational schema, embedded C++ for firmware, and now declarative infrastructure as its own kind of code.
Evidence
| Claim | Evidence | Artefact |
|---|---|---|
| Twenty-two agencies and twenty-three brands | The client wall, carried from the résumé and the recovered site content | Client wall |
| Work across six technology eras | Six exhibits from OO ActionScript to a hand-written Nix package | Code exhibits |
| Rescue work under immovable deadlines | Multiple engagements recorded as rewrites of stalled projects | Client wall |
| Sponsorship of the later product era | 2014–2020 product work described in the résumé | Products |
Trade-offs and limits
- Historic work is labelled historic. Nothing in this section is presented as current capability; where a technique is still used today, the page links to where it is used.
- One engagement has no screenshot. The national archive work was an internal tool. It is described and not illustrated, because there is nothing legitimately publishable to show.
- No client has been named beyond a brand. Brands are named because they were public campaigns. Individuals, internal contacts and unpublished commercial detail are excluded.
- The exhibits are excerpts. Around forty lines each, chosen to show judgement — structure, error handling, an exit plan — not to demonstrate volume.
Drill-downs
- The client wall — level 3
- Six code exhibits across five eras — level 3
- Products — the commercial era that followed — level 2
Period and confidence
period: 1999–2014. Confidence is historic: this is work that is finished, and it is presented in the past tense throughout.