Files
ai-resume/content/ai/l3/ai-paperclip-pipelines.md
Documenter 00fa15f98f Phase 1: content source of truth — 40 documents across six areas
Satisfies the Phase 1 Definition of Done:

- content/ validates cleanly against the frozen schema. `make validate`
  reports OK: 40 document(s) validated, 0 violations.
- Six areas exist, each with an L1 entry: ai-overview, platform-overview,
  edge-overview, products-overview, history-overview, about-overview.
- All six areas have an L2 entry: ai-systems, platform-estate, edge-fleet,
  products-business, history-engagements, about-narrative.
- 28 L3 artefact stubs under content/<area>/l3/. Every artefacts[].url in
  every document resolves to one of them; the validator proves there are no
  dangling references (and a deliberately broken copy exits 1).
- Every metric value traces to a source line in the evidence notes or the
  approved metric set in reference/content-map.md (per-metric citations are
  recorded in the AUD-131 completion comment).
- Every document carries confidence and last_verified=2026-10-26; the
  validator rejects a missing or non-canonical value.
- docs/content-redaction.md records the redaction pass: identifiers, third
  party personal data, credentials and infrastructure detail excluded, with
  reasons, plus the two numbers that are reported rather than smoothed.

Honesty positions held: 3 businesses active (12 adoptions over time),
Where-Woof deployed and pre-market, failures kept in (edge-failures), no
promotion of in-progress work to delivered.

No site code, no templates, no CSS, no rendering (Phase 2).
2026-10-26 17:30:35 +11:00

1.3 KiB
Raw Blame History

id, area, level, title, claim, confidence, period, tech, metrics, artefacts, public, last_verified, tags
id area level title claim confidence period tech metrics artefacts public last_verified tags
ai-paperclip-pipelines ai 3 Artefact — Paperclip and n8n pipelines in production Sixteen or more pipelines run real work — scanners · schedulers · project agents — with specialist agents dispatched by task and human approval gates on anything consequential. running 2020–
Paperclip
n8n
Prefect
LangGraph
label value
pipelines on n8n and Prefect and LangGraph 10
label value
Paperclip pipelines 6
true 2026-10-26
ai
pipelines
agents
artefact

Artefact — Paperclip and n8n pipelines in production

Status: stub. A redacted run log of one pipeline lands in Phase 7, alongside the pipeline inventory.

What the artefact is

One pipeline shown end to end: trigger, steps, the agent or model each step uses, the approval gate, and the run log with identifiers removed. Alongside it, the inventory of what the sixteen or more pipelines do — email scanners, school-portal scanners, calendar scanners, project oversight, and the household automations.

What it proves

Volume with operations behind it: these are scheduled, logged and monitored, not run once for a demonstration.

When it is delivered

Phase 7. Counts come from the evidence notes, section 3.